RFQ Checklist for China Suppliers: Get Comparable Offers
Sources checked 23 October 2026Next review 23 October 2027Published 23 October 2026
Short answer
Build the RFQ around one identified product version, stated quantities and a common response sheet. Ask suppliers to confirm each requirement or mark an exception. Compare offers only after you know which version, inclusions and timing assumptions each supplier priced.
Where this applies: Global buyers requesting goods from mainland China; a purchasing communication framework, with product rules and payment decisions handled separately.
Checklists and examples are Shop8 editorial recommendations. Reviewed by a separate AI agent in a separate context; the same model family was used. No human editorial review has been completed.
In this guide
Use this when you need a price you can act on
This Shop8 checklist is a recommended way to prepare a formal request for quotation after an initial capability conversation. It suits a buyer who can describe the intended product and wants several suppliers to price the same request. If the design is still open, request a feasibility discussion first and label any early prices as provisional.
ASQ lists a formal quotation supported by specifications and other requirements among supplier-evaluation methods. ASQ supplier quality guidance supports that narrow principle; the RFQ structure below is Shop8's own working method.
Create one controlled buying baseline
- Name the item and version. Give the product a buyer reference and attach a dated specification. List every attachment so a missing drawing is visible.
- State the quantity scenario. Separate the first order, optional quantity bands and any forecast. Label a forecast as planning information rather than an order commitment.
- Describe the supply boundary. Identify the required product configuration, packaging and handover location. Ask suppliers to state what their quoted scope includes.
- Name the requested milestone. Explain whether your requested date means production complete, goods ready for inspection or ready for collection.
Ask for a structured response, including exceptions
Send a short response table rather than asking for a single total. Request the quoted item revision, currency, unit basis, quantity, unit price, separately priced items, minimum quantity, production timing assumptions and offer validity. Ask the supplier to return its own quotation reference and revision as well.
For each requirement, offer three reply choices: confirmed, exception or needs clarification. Require an explanation beside every exception. This gives the supplier a place to disclose a different material, packaging method or schedule rather than leaving you to infer agreement from a price.
Run this pre-send check
| Check | Question to resolve before sending |
|---|---|
| Product | Could two readers identify the same version from the attachment list? |
| Quantity | Are units, assortment and quantity bands unambiguous? |
| Scope | Are packaging and separately requested services visible? |
| Timing | Does the requested date name an event and its prerequisites? |
| Reply | Is there a response deadline with a time zone and a named contact? |
Do not invent missing technical requirements merely to finish the form. Mark an unresolved field and ask a specific feasibility question. If it affects the price materially, hold that part of the comparison open.
A short RFQ instruction you can adapt
The following is an invented communication example, not a real order: “Please quote buyer item TRAY-01 against specification revision B and the attached packaging brief. Return separate offers for 500 and 1,000 units. Confirm the exact revision priced, list exclusions, identify any required buyer approvals and state the date each quantity could be ready for inspection. Please return the response sheet by the stated deadline, or tell us which fields need clarification.”
The value is the separation of baseline, options and exceptions. A supplier can propose an alternative, but ask it to price the baseline separately so the alternative does not silently replace your request.
RFQ limits and your next action
An organized RFQ records what you asked suppliers to price. It does not establish that a supplier can manufacture it, that a quoted product is suitable for a destination market or that a future shipment will match the specification. Those decisions need their own evidence.
Watch for a quote that references an old attachment, combines different quantity bands or answers every requirement with a general “yes.” Send one consolidated clarification list. Your next action is to check the returned offer against the response fields before entering its price into a comparison sheet.
Sources and editorial method
Sources support the attributed facts below. The worksheets, examples and decision steps are Shop8 recommendations, rather than requirements issued by these organisations.
- [1]What is Supplier Quality Management? Supplier Selection Criteria — American Society for Quality (ASQ). Checked 23 October 2026.
Update history
23 October 2026: first draft prepared. 23 October 2026: first publication. Review sooner if a cited source or the buying requirements change.