• Supplier identity and risk
  • Global buyers · suppliers in mainland China

Supplier Customer-Reference Checks: Ask About Comparable Order Performance

Short answer

Speak with a consenting customer whose work is relevant to your proposed order. Establish their role and the order context, then ask the same core questions about the agreed requirements, actual delivery, issues and resolution. Record direct observations separately from opinions and unanswered questions. Use the feedback alongside other evidence, with the reference-selection limits visible.

Where this applies: A buyer's reference conversation for goods sourcing; it does not establish product compliance, solvency or a guarantee of future performance.

Checklists and examples are Shop8 editorial recommendations. Reviewed by a separate AI agent in a separate context; the same model family was used. No human editorial review has been completed.

In this guide
  1. Choose a reference for a defined question
  2. Establish what the customer actually handled
  3. Use a consistent core questionnaire with concrete follow-ups
  4. Write evidence notes that retain context
  5. Reference limits and your next action
  6. Sources

Start with the uncertainty you want to address: handling revisions, coordinating several versions, communicating schedule changes or resolving a documented quality problem. Ask the supplier whether a relevant customer is willing to speak. Explain the topic and keep the initial request short. Do not ask for another buyer's confidential order file or assume an introduction permits publishing their comments.

The Australian Digital Health Agency's reference guidance, written for digital-health procurement, emphasizes relevant references, reducing reliance on vendor-selected recommendations and a consistent questionnaire. Shop8 adapts those general interview principles here for goods sourcing; its source is not a factory-evaluation standard.

Record how each reference was selected. If only one supplier-nominated contact is available, state that limitation rather than describing the interview as a representative view of all customers.

Establish what the customer actually handled

At the start, confirm the person's role, approximate project period, product or service scope and involvement in the order. Ask which parts they observed directly. Someone responsible for payment may be able to discuss communication but may not know how technical acceptance was assessed.

Use an independently obtained business contact route where appropriate to corroborate the person's stated role. Record what was checked and what remains unconfirmed. A matching email domain or introduction does not establish the accuracy of every statement.

Ask permission to take notes and agree how the comments may be used internally. When the person cannot discuss a topic, mark it unavailable rather than treating the lack of an answer as a negative report.

Use a consistent core questionnaire with concrete follow-ups

  1. Baseline: What did the supplier agree to deliver, and what part of that agreement did you manage?
  2. Schedule: What were the agreed and actual milestones? Were changes caused by the supplier, the buyer or another dependency, as far as you observed?
  3. Product result: What checks did your team perform, and which issues were identified? What part of the result can you discuss?
  4. Communication: Describe a specific instance when a requirement or date changed. How was it acknowledged?
  5. Resolution: If a problem occurred, what was requested, what action followed and what remained unresolved?
  6. Fit: For which kind of order would you consider using the supplier again, and under what conditions?

Keep those core questions consistent across candidates. Add follow-ups to clarify the answer, not to coach the customer toward a positive or negative judgment. Ask for an event or example when an answer is simply “excellent service.”

Write evidence notes that retain context

Use columns for question, direct observation, opinion, supporting context and unresolved point. If a customer reports defects but cannot give an order quantity or inspection scope, retain the description without calculating a defect rate. If a delivery was late, preserve the agreed baseline and any stated dependency before attributing responsibility.

For a fictional interview, a customer says, “The revised packaging was acknowledged in writing, but the first shipment used the previous version; the supplier replaced it.” Record the reported event and resolution. Do not turn it into “supplier always resolves defects” or “supplier cannot control revisions.” Follow up with the candidate about the process proposed for your order.

Reference limits and your next action

References cover particular people, orders and periods. They do not prove current capacity, technical compliance or the outcome of your future order. Positive feedback and negative feedback both need context; neither replaces evaluating your proposed product.

Compare the notes with supplier replies and other evidence. Where accounts differ, write the discrepancy as a question and request clarification without sharing confidential comments beyond the permission given. End with one action: resolve a material gap, request another relevant reference or carry a specific control into sample or order evaluation. Keep the basis of that decision visible.

Sources and editorial method

Sources support the attributed facts below. The worksheets, examples and decision steps are Shop8 recommendations, rather than requirements issued by these organisations.

  1. [1]
    Guidance on conducting reference checks — Australian Digital Health Agency. Checked 27 October 2026.

Update history

27 October 2026: first draft prepared. 27 October 2026: first publication. Review sooner if a cited source or the buying requirements change.